By
this website section, the whole and most significant
experiences and
activities performed by Spare
Engineering have been listed.
Obviously, content quoted for each listed position is quite
synthetic, and therefore, where it may be required, it can be completed
by the other two sections available, where the more recent
activities are listed in detail, as also the most significant too.
Do not hesitate in contact
us if you will not find enough information by
mentioned sections.
 |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2013 |
Basis
Engineering
|
Rosetti
Marino |
INAgip d.o.o. |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
IKA
Field - IKA JZ EPC and
IKA A revamping
|
 |
Activity Description |
Development
of detail engineering field instruments project literature (Data
Sheets, IDS,
RDDS and
MR), performed for items like ESD and BDV actuated valves (including the Local Control Panels), choke, wing, safety & control valves,
pressure & temperature transmitters, pressure, level and
temperature gauges, pressure switches, pig signallers and orifice
plates).
In a further stage, Technical Bid Evaluations have been performed for all of the above listed field instrument items. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2012 |
Basis
Engineering
|
Rosetti
Marino |
Foxtrot - Mustang |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Marlin
Field Development
|
 |
Activity Description |
Complete and detailed Tender literature
endorsement for all the Telecommunication discipline implied aspects. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2012 |
Basis
Engineering
|
Rosetti
Marino |
Total E&P UK |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
West
Franklin and
Elgin B platforms (North
Sea)
|
 |
Activity Description |
First draft emission and next revision "valid
per order" for Material
Requisition (inclusive of IDS and RDDS) and Data
Sheets documents, have been duly performed for instrument
items like nucleonic levels, GWR
levels and sand detectors. For the nucleonic levels,
preparation and assistance for the kick-off meeting
with Vendor,
have been also provided.
Detailed drawings for the level related drums items have been
prepared too.
As a further additional project activity, a final detailed Gap Analysis for
both platforms have been
prepared (the Excel™ format report have been originated by the
bid's P&ID
comparison with the detailed engineering phase P&ID, duly
filled with the required mark
ups. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2011 |
Basis
Engineering
|
Rosetti
Marino |
Total E&P UK |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
West
Franklin and
Elgin B platforms (North
Sea)
|
 |
Activity Description |
Complete Tender
literature
endorsement for Instrument
& Control discipline implied aspects.
Additional endorsement for all the project literature related
to Telecommunication
discipline activities,
including the NESSCO's
preliminary bid evaluation as also the computation of a Gap Analysis (for
economical impacts 'punch
list'), originated by modified contractual requirements. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2011 |
Basis
Engineering
|
Rosetti
Marino |
Shell UK |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Clipper
PLQ Upgrade Project
|
 |
Activity Description |
Bid project documentation review for all the Instrument & Control
and Telecommunication
disciplines aspects, in order to carry out the Tender
qualification section preparation (in terms of congruity verification and
clarification requests for the Client's
supplied literature). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2010-11 |
Basis
Engineering
|
Rosetti
Marino |
Agip KCO |
Italy |
 |
Industry |
Project |
Oil
& Gas - Midstream |
Kashagan
Pig Trap Skids Procurement
|
 |
Activity Description |
Technical Vendor's bids
evaluation for all skids actuated
valves including LCP
(Local Control Panels), pig detectors, pressure and temperature
transmitters, with
the next preparation of the related Data Sheets
revision
per order.
Hook
up drawings complete revision (primary & secondary
typical), including the consequent revision of the implied MTO
(Material Take Off).
MIAP
material codification assistance for all the revised and/or modified MTO's
parts/materials.
Instrument layout drawing revision (including piping layer),
for all skids.
Skids electrical layout drawings revision.
Large amount of project drawings revision, for the new consortium
logo (KCOI)
introduction, and the inclusion of appropriate fields for
the next russian translation process (bilingual texts). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2010 |
Basis
Engineering
|
N.A. |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Canonica d'Adda Feed
|
 |
Activity Description |
Development of instrumentation engineering
for FEED,
performed both for specialized aspects (Data
Sheets, IDS,
RDDS
for plant valves like
choke, wing, ball ESV, gate BDV, pneumatic
actuated valves local panels regulation and safety valves, orifice
plates), as
also for required plant installations documentation (Data
Sheets, IDS,
RDDS
for telecommunication
and instrumentation cables, as also for optical fiber cables). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2010 |
Basis
Engineering
|
Tecon |
Abu Qir Petroleum |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
ABU
QIR - WAQ PI
Platform Revamping
|
 |
Activity Description |
CAD drafting of P&ID
retrieved directly from older existing paper format, due to absence of
similar documents in electronic format, implemented with care for
layers definition in terms of main lines, secondary lines, equipments,
etc., according to the
different thickness of plotter pens, as also for the standard symbols
as required by the Client (obviously were also incorporated mark up and
comments originated by the Client). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2010 |
Basis
Engineering
|
Rosetti
Marino |
Agip KCO |
Italy |
 |
Industry |
Project |
Oil
& Gas - Midstream |
Kashagan
East Field Development (Test
Separator)
|
 |
Activity Description |
Changes and comments integrating activities
for drawings to be related to both, electrical and instrumentation
disciplines, like Isometric Tracing Sketches, Loop
Diagrams and
Wiring
Diagrams, all to be related to skid B4-200-XY-001 (Test
Separator). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2009-10 |
Basis
Engineering
|
Rosetti
Marino |
Agip KCO / KCOI |
Italy |
 |
Industry |
Project |
Oil
& Gas - Midstream |
Kashagan
Pig Trap
Skids (AKCO - EPC2, EPC3, EPC4)
|
 |
Activity Description |
Development of detailed instrumentation
engineering (document drafting and subsequent revisions), performed
both for specialized aspects (Supply
Specification, Data
Sheets, IDS,
RDDS,
for pressure, temperature and flow transmitters, pressure and
temperature gauges, orifice plates, electrical valves MOV, pneumatic SDV valves
completed with LCP
local panel, Instruments
List, Valve
List etc.
), as also for required plant installations documentation (MTO for
instrumentation bulk, Primary and Secondary Hook-ups,
Instrumentation and Junction Boxes Layout,
Instrument Air Distribution Layout,
Instrumentation Cable Routing Layout,
Wiring
Diagrams, Cable Block
Diagram, Instrumentation Cable and Cable Tray Data Sheet,
etc.).
Were also implemented all the activities related to materials
codification as per MIAP system.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2009 |
Eurotherm
|
Snamprogetti |
Sonatrach |
Italy |
 |
Industry |
Project |
Oil
& Gas - Midstream |
Oleoduc LZ2 24” GPL Hassi
R’Mel – Arzew
|
 |
Activity Description |
Translation from Italian to French of the
following documents, verifying the congruity for its contents, related
to Invensys's
control system:
- Functional Design Specification;Oleoduc LZ2 24” GPL Hassi
R’Mel – Arzew
- Control System Operator Personnel Training
Course (Vendor premises);
- Control System Operator Personnel Training
Course (on site);
-
Inspections and Tests Plan;
- Factory
Acceptance Tests
- Project Organization Chart;
Translation
from English to French of the following documents:
-
Project Execution Plan.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008-09 |
Basis
Engineering
|
Saipem
SA / R. Marino |
Total E&P Congo |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Libondo
LBD1 Platform
|
 |
Activity Description |
Development
of detailed instrumentation engineering (drafting and subsequent
revisions
for documents like Technical
Specification, Data
Sheets, IDS
RDDS),
to be related to pressure, temperature, level transmitters, as also
pressure and temperature gauges, orifice plates, pressure, temperature
and level switches, as also on-off valves (SDV
e BDV), electrical MOV (XV e Choke), regulation
and safety valves.
Hazop session
presence for the identification and assessment of risks
related to security and continuity of the plant management
system. Repeated meetings with Final Customer has been
performed, for the check of the document progress as also for
the correct definition of the I/O
List and the other aspects (e.g. data format), related to
the
ICSS (Infautelec). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008 |
Basis
Engineering
|
Rosetti
Marino |
Edina (Edison / INA) |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Izabela
North & South Platforms
|
 |
Activity Description |
CAD drafting and revision of P&ID and Block Diagrams
retrieved from similar documents in electronic
format. Drawings have been prepared for both platforms,
implemented according to the mark-up
and comments originated by Client.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008 |
Basis
Engineering
|
Rosetti
Marino |
Edina (Edison / INA) |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Izabela
North & South Platforms
|
 |
Activity Description |
Development
of detailed instrumentation engineering (document drafting and
subsequent
revisions), for pressure, temperature and multivariable transmitters,
pressure, temperature and level gauges, orifice plates, pressure,
temperature and flow switches, pneumatic valves (SDV, BDV and related LCP),
electrical valves MOV
(choke and XV), liquid discharge valves, regulating and safety valves,
etc.
Same type of documents have been implemented for Fire
& Gas devices, Sand
Detector and
Fiscal Flow Measurements, both
on primary elements (Daniel
Senior), and ultrasounds. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008 |
Sogepi
|
N.A. |
Caffaro Torviscosa |
Italy |
 |
Industry |
Project |
Energy - Biodiesel production |
Raw oils and refined biodiesel pipelines
|
 |
Activity Description |
First drafting of instrumentation basic
engineering (almost detailed), to be related to plant for the transfer
of raw oils (incoming raw vegetables oils) and biodiesel (as refined
product), with pipelines between the marine terminal, and the refinery
plant. Implemented instrumentation engineering has been performed for pressure, temperature and
flow transmitters,
pressure and temperature gauges, pneumatic valves (SDV, XV and related LCP),
regulating and safety valves,
etc. Further
relevant developed documents are as follow:

- Instrumentation General Specification for
Pumping and Flow Metering Station;
- Technical
Specification for Fiscal Flow Metering Systems;
-
Technical
Specification for On-Off Valves;
-
Instrument
List for Pumping
and Flow Metering Station;
- I/O List for Remote
Control System (DCS);
- etc.

Meetings
and survey
on site with Final Customer have been performed, for the proper
definition of documents, and entrusted activites. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Guendalina
platform and Tea
platform revamping
|
 |
Activity Description |
CAD drafting and revision of P&ID retrieved
from similar
documents in electronic
format. Drawings have been implemented according to the mark-up
and comments originated by Client.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2008 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Guendalina
platform and Tea
platform revamping
|
 |
Activity Description |
Development
of detailed instrumentation engineering (Technical
Specification, Data
Sheets, IDS drafting and subsequent
revisions), for Fiscal Flow Measurement based on primary elements (Daniel
Senior), and for Ultrasounds Flow Meter. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2007-09 |
Basis
Engineering
|
Rosetti
Marino |
Agip KCO |
Italy |
 |
Industry |
Project |
Oil
& Gas - Midstream |
Kashagan
Complex A & D Pig Trap
Skids
|
 |
Activity Description |
Development of detailed instrumentation
engineering (document drafting and subsequent revisions), performed
both for specialized aspects (Supply
Specification, Data
Sheets, IDS,
RDDS,
for pressure, temperature and flow transmitters, pressure and
temperature gauges, orifice plates, electrical valves MOV, pneumatic SDV valves
completed with LCP
local panel, Instruments
List, Valve
List etc.
), as also for required plant installations documentation (MTO for
instrumentation bulk, Primary and Secondary Hook-ups,
Instrumentation and Junction Boxes Layout,
Instrument Air Distribution Layout,
Instrumentation Cable Routing Layout,
Wiring
Diagrams, Cable Block
Diagram, Instrumentation Cable and Cable Tray Data Sheet,
etc.).
Were also implemented all the activities related to materials
codification as per MIAP system. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2007 |
Basis
Engineering
|
Rosetti
Marino |
Petrobel |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Theka
2 monopode platform
|
 |
Activity Description |
Implementation of the instrumentation bulk
material MTO. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2007 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Ravenna Gas Plant
- Angela
platform - Angelina
|
 |
Activity Description |
Development of detailed instrumentation
engineering (document drafting and subsequent revisions), performed
both for specialized aspects (Technical Specification,
Data
Sheets, IDS,
for pressure, temperature and flow transmitters, pressure gauges,
orifice plates, pneumatic SDV
and BDV
valves,
completed with LCP
local panel, safety valves
etc.
), as also for required plant installations documentation (Instrumentation and
Junction Boxes Layout,
Instrument Air Distribution Layout,
Instrumentation Cable Routing, etc.).
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2007 |
Basis
Engineering
|
Rosetti
Marino |
INAgip INA / Agip |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Katerina
Platform
|
 |
Activity Description |
Complete revision of the whole set of
documents related to the instrumentation discipline aspects, to the "as built" condition. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2006-07 |
Basis
Engineering
|
Rosetti
Marino |
Maersk |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Tyra
South East Field
Development
|
 |
Activity Description |
Development of instrumentation engineering
for Tender of
platform Tyra B
(Technical Specification, Data
Sheets, IDS,)
for SDV and BDV valves, choke
valves, regulating valves, etc.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2006 |
Basis
Engineering
|
Rosetti
Marino |
INAgip INA / Agip |
Italy |
 |
Industry |
Project |
Oil
& Gas - Upstream |
Ana
/ Vesna Field Development
|
 |
Activity Description |
CAD drafting and revision of P&ID for
both platforms, retrieved
from similar
documents in electronic
format. Drawings have been implemented according to the mark-up
and comments originated by Client.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2006 |
Basis
Engineering
|
Rosetti
Marino |
ENI Congo |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Ikalou
Development Project
|
 |
Activity Description |
Technical evaluation of SDV and BDV valves, choke valves,
safety valves and multiphase flow meters (MPFM), for both
platforms (Ikalou
and Ikalou South). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2006 |
Basis
Engineering
|
Rosetti
Marino |
Maersk |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Halfadan
North East Phase 3 Development
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical
Specification, Data
Sheets, IDS), related to BS&W
monitor, pressure, temperature, level and flow transmitters, pressure,
flow and level gauges, orifice plates, SDV and BDV valves, safety valves, Fire & Gas
devices, V-Cone
flow meter system,
etc.
Pneumatic and hydraulic primary hook-up
as also electrical secondary hook-up and Fire
& Gas devices
have been implemented as a combined CAD drawing and
instrumentation
activities. Following above mentioned activities, the consequent MTO
for instrumentation bulk materials have been prepared as well. |

|
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2005 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Ravenna
Gas Plant - Compression Station Revamping
|
 |
Activity Description |
Development of instrumentation engineering
for Tender EPC (Data
Sheets, RDDS
and IDS),
related to actuated SDV
and BDV valves,
liquid discharge valves, as also for the local electro-pneumatic
panels, feeding such valves.
It
have been also prepared the following documents:

- primary and secondary
hook-up;
- MTO
for instrumentation bulk materials;
- instrumentation and junction boxes layouts;
- pneumatic instrumentation and pneumatic distribution
layout;
- instrumentation cables list;
- instruments list;
- I/O list. |

|
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2005 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Pineto
Compression Plant
|
 |
CAD drafting of Loop Diagrams and P&ID
retrieved directly from older existing paper format, due to absence of
similar documents in electronic format, implemented with care for
layers definition, according to the
different thickness of plotter pens, as also for the standard symbols
as required by the Client.
Mark up and
comments originated by Client due to a survey, have been
incorporated as well.
|
  |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2005 |
Basis
Engineering
|
Rosetti
Marino |
Maersk |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Valdemar
Field Development - Valdemar
BA Platform
|
 |
Activity Description |
Development of instrumenttionl engineering
for Tender EPC,
related to the following activities and/or documents:

- complete check of Tender documentation;
- check of Equipment
List against P&ID
and Scope of
Works;
- MTO
for instruments and regulating valves;
- MTO
for instrumentation bulk materials;
- instrument list. |
  |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2005 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Miglianico
Project - Ortona
deposit
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical Specifications),
related to the following documents:
- multiphase flow meter (MPFM);
- telephone system (PABX)
and optical fibers.  |
  |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2004-05 |
Basis
Engineering
|
Rosetti
Marino |
Maersk |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Valdemar
Field Devlopment - Valdemar
AB Platform
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical
Specification, Data
Sheets and
IDS),
related to BS&W
monitor, pressure, temperature, level and flow transmitters, pressure,
flow and level gauges, orifice plates, SDV and BDV valves, safety valves, Fire & Gas
devices, V-Cone
flow meter system, etc.
Pneumatic and hydraulic primary hook-up
as also electrical secondary hook-up and Fire
& Gas
devices
have been implemented as a combined CAD drawing and
instrumentation
activities. Following above mentioned activities, the consequent MTO
for instrumentation bulk materials have been prepared as well.
Technical
evaluation for BS&W
monitor, flow gauges, multiphase flow meter (MPFM), Fire & Gas
devices, pressure,
temperature, level and flow transmitters, have been performed. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2004 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Candela
Gas Plant - Gas Povero project
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical
Specification, Data
Sheets and
IDS),
related to actuated SDV
and BDV valves,
liquid discharge valves (as also for the local electro-pneumatic
panels, feeding such valves), wing valves and safety valves. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2004 |
Basis
Engineering
|
Rosetti
Marino |
INAgip INA / Agip |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Katerina Platform
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Data
Sheets),
related to pressure and
temperature transmitters, level and flow switches, actuated SDV
and BDV valves (as
also the local electro-pneumatic
panels), self regulating valves and safety valves.
It
have been also prepared the following documents:

-
Instrument Installation Philosophy;
- WHCP
(Well Head Control Panel)
Functional Diagram;
- Technical Specification for Skid
Mounted Instrumentation;
- Telecommunication Documents (equipment list, architecture,
philosophy, specification, etc). |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2004 |
Basis
Engineering
|
Rosetti
Marino |
Petrobel |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Themsa
4 Platform
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical
Specification, Data
Sheets and
IDS),
related to pressure,
temperature, level and flow transmitters, pressure and temperature
gauges, orifice plates, SDV
and BDV valves as also safety valves,
etc. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2004 |
Basis
Engineering
|
Rosetti
Marino |
ENI Divisione E&P |
Italy |
 |
Industry |
Project |
Oil & Gas - Upstream |
Fano
Low Pressure Plant - Brenda
Platform
|
 |
Activity Description |
Development of detailed instrumentation
engineering (Technical
Specification, Data
Sheets and
IDS),
related to pressure,
temperature, level and flow transmitters, pressure and temperature
gauges, orifice plates, SDV
and BDV valves as also safety valves,
etc.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2003-04 |
ABB
PS&S
|
SARPI |
Sonatrach |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Project Traitment d'Huile des Champes BBK / BBKN
|
 |
Activity Description |
Against to what was originally planned, in
place of generic support for the development of the
instrumentation engineering activities implied within the project,
duties
normally covered by the Project
I&C Leader
position were carried out: this is occurred due to repeated changes of
the project
task force arranged by the Client and its operational needs.
Due to such reasons, since the early stage of the project,
all duties and activities normally implied by that position have been
carried out, of course, at the Client's premises.
Scheduled meetings with the Final
Customer (team of resident engineer), check of work
progress, and resource management (with
a partial outsourcing) with
the I&C Leader, coordination with the Project Manager,
and regular interdisciplinary meetings and planning for the incoming
activities, are just some of the tasks performed.
In addition to mentioned project management, however, it
have also
been proceeded with the operational development of several
project documents (e.g. Specification
Technique du Système de l'Instrumentation, Specification Technique pour
l'Instrumentation des Units Package, Specification
Technique du Comptage Multi-Phase de Debit (MPFM), etc.),
as well as to attend to numerous meetings with the Vendors for the
supply of the different plant packages, as also the technical
evaluation and the kick-off meeting for some of them.
In a second project phase, only after an almost complete performing of
the field instrumentation tasks and duties, it has been required to
also cover the control room side aspects, due to a new and changed arrangement of the
Client's project task force.
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
2002-03 |
N.
A.
|
Tecnomare |
Agip KCO |
Italy |
 |
Industry |
Project |
Oil & Gas - Midstream |
Kashagan East Field Development -
Experimental Program
|
 |
Activity Description |
Development
and verification of detailed instrumentation
engineering related to FEED
activities performed directly at the Client's premises.
Such project developments activities
have been carried out
under the supervision of Client's task forces leaders, and have
required the revision and the completion of a very large
number of
documents, in order to incorporate comments originated both by
the Final Customer,
as also under the internal company review.
Significant contributions have been offered for the
preparation, for example, of the relevant documents like the General
Specfication for
Instrumentation (as also for the Packaged Instrumentation), while for others documents like multiphase
flow meter (MPFM) data sheet, pneumatic and pneumo-hydraulic valves
command layouts typical, these have been developed as brand new
documents. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
1999 |
N.A
|
ABB Sae
Sadelmi |
CEGCO |
Italy |
 |
Industry |
Project |
Power - Generation |
Aqaba
Thermal Power Station, Units 3, 4
& 5
|
 |
Activity Description |
Management and resolution of a Punch
List, essential to achieve the minimal optimal conditions
required for the subsequent plant hand-over.
Such large activity took place over several months, and have been
carried out directly at the Client premises, in close collaboration
with the on site
engineers, as also with the I&C
Manager,
always with the prior approval of the Project Manager.
After
the progressive depletion of instrumentation aspects of such Punch List, also
the electrical aspects have been carried out as well. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
1988-98 |
N.A
|
N.A. |
N.A. |
Italy |
 |
Industry |
Project |
N.A. |
N.A.
|
 |
Activity Description |
During
such time period, similar and repeated activities have been performed,
but even if these may appears as less relevant, due the repeated presence of PLC programming,
these
may still offer interesting evaluation aspects, either for the
related PLC specific configuration or for the customized PLC
software development. For some of mentioned PLC
based
solutions, the functional verification or complete start-up
and
commissioning have been performed, including some foreign locations.
Within the most significative activities the following are
listed:

Drying desulphurisation beds
automatic alternate regeneration: PLC
configuration design and development of related automation
and control software.

Recycled plastic storage and
granulation plant for the production of different thickness films:
on-site support and optimization of PLC software.

Automatic blooms (coming
out from the casting section)
de-scaling system: PLC configuration design and development of
related automation and control software.

Smoke abatement system for
particulate reduction (fume hoods on pouring ladles
and blast furnace): development of related PLC software and
subsequent start-up and commissioning.

Fertilizer (urea) production
plant:
development of part of the handling software, including functional
tests with the Client and the preparation of the operator
manuals
in English.

Automatic drawing machine for
steel wire strand to be used for tires manufacturing: PLC configuration design and development of related automationand control
software,
inclusive of significant features for self-diagnostic and
faults/anomalies report (external auxiliary display driven directly by
PLCs 'digital outputs as HMI).

Automation and control related
to physical and chemical processing of steel strand coating treatments (steel
strand to be used for tires manufacturing):
PLC configuration design and development of
related automation and control software.
Considerable presence of several analog signals.

Pipes binding machine automation
(drill rods packaging),
by various packaging sizes and shapes (as different combinations of
pipes), by different pipe diameters: development of the related automation and
control software,
characterized by a significant complexity, both for positioning on axes
(by encoders and "optical" rulers),
comparable to a CNC
(for the pipes binding and positioning head), and
for the coordination of packaged lots (by a RS232 comunication), with a
remote PC supervisor, and at last, to verify the packed
lot weight
(by a weighing station integrated into the pipes binding machine).
|
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
1988 |
Ceda
|
Danieli |
JS Sumy Frunze NPO |
URSS |
 |
Industry |
Project |
Steel - Continuous
Casting |
World largest bloom conticaster (650 x
650 mm) |
 |
Activity Description |
Activities as PLC site support
engineer have been performed, in supporting the site software project leader.
The PLC control architecture oversaw a complex and innovative concept
of continuous casting (conticaster),
characterized by the presence of magnetic stirres in molds
(interchangeable, by various sizes), by in line oxyacetylene cutting
system (operating during the bloom casting), coordinated with a
90° tipper, in order to avoid the usual "curvature" of the
casted blooms (often considered as detrimental for the final metal
cristalline structure quality). In addition to the usual communication
PLC cards with the factory supervisor (host), the above solution also
includes several further PLC cards for encoder readings, motion
control, etc. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
1988
|
Carlo Gavazzi
Impianti |
Saipem
|
BOTAS
|
Turkey |
 |
Industry |
Project |
Oil & Gas - Midstream |
2nd ITP (Iraq
Turkey Pipeline) Expansion |
 |
Activity Description |
To better understand activities implied by
present item, and although it is chronologically later, it is
recommendeed the prior reading of the further below listed item.
In fact, the design criteria for the Turkish section of the pipeline,
essentially was correspondent to what have been developed for the
parallel pipeline section located in Iraq, and as it have been
for such section, also for the Turkish side, were needed significative
modifications.
Consequently, with the aim to achieve a reasonable design uniformity
and a similar management philosophy for both pipeline sides, and with
the implied agrement of the two pipeline owner bodies (Botas and Scop),
a close cooperation with the Turkish side PLC site engineer have been
perfomed, in making sure that such requirements have been faced and met
in full. |
 |
 |
Year |
Sub-Contractor |
Main Contractor |
Final Customer |
Location |
1987-88
|
Carlo Gavazzi
Impianti |
Saipem
|
SCOP (NPO)
|
Iraq |

|
Industry |
Project |
Oil & Gas - Midstream |
2nd ITP (Iraq
Turkey Pipeline) Expansion |
 |
Activity Description |
Following to a reasonable time period of project introduction
held at the Client
headquarters of Marcallo,
it have been reached the
installation site as software leader, where, in accordance to the
original plans, were to be aquitted for the set-up and commissioning
activities related to the software of different PLC (installed in each
pipeline pumping station), and the verification of the proper
communication with the tankfarm
supervisor. It was in fact possible to control the whole pipeline by
the remote RTU.
In the reality, a Final
Customer virtually "militarized" and thus more
intransigent (in those years, Iraq was engaged in a war with Iran, and
among other things, the pipeline was considered as a military
target), the poor and inadequate availability of documents related the
existing
plant sections (often never updated "as built"), and at
last, initial surveys performed not enough deeply, led to numerous and
substantial design changes to software performed at the End Customer's
plant (field),
moreover, to be agreed, one by one with the End Customer, by
mean of repeated meetings performed on site, sometimes in presence of
the Main Contractor's
officials.
Furthermore, in terms of commissioning and testing of such agreed
operational sequences, shut down of such lucrative plant was to
be completely avoided, so these tests were possible only in
manual and/or semiautomatic modes (often with the isolation of the
field actuation device and/or the feedback to remote control system),
or either during scheduled or unexpected plant stops, both for total or
partial pumping station sections (e.g. launching and receiving pig
traps).
|
 |
|
|
 |
|
 |
|
 |
|
|